15 TMI 5301 SHEN YIH (PDF)




File information


This PDF 1.3 document has been generated by / Foxit PDF Creator Version 3.0.1.0109, and has been sent on pdf-archive.com on 20/11/2015 at 02:15, from IP address 197.211.x.x. The current document download page has been viewed 636 times.
File size: 133.13 KB (1 page).
Privacy: public file




Document preview - 15-TMI-5301 SHEN YIH.pdf - Page 1/1





File preview


(주) 풍 국(한국본사)
53,DUNCHON-DEARO 457 BEON-GIL, JUNGWON-GU, SEONGNAM-SI. GYEONGGI-DO, KOREA
TEL:82 31 732 1651-60 / FAX: 82 31 732 2076 / E-mail: csl@pungkook.com
PURCHASE ORDER SHEET
TO

SHEN YIH ENTERPRISE CO.,LTD

ATTN.
CONTACT
P/O No.

Thiên Thanh

PN-20151118-0118 ( 15-TMI-5301)

SHIP TO.

WH-PKS1(A/C)

BILL TO.

PUNGKOOK CORPORATION

SHIPMENT

Ocean Freight

Season:

/ PKS1A

P/O DATE

Ship to VietNam

DEILVERY

2015-12-03

Inco. Terms

Cost, Insurance and Freight(CIF)

PAYMENT

T/T IN ADVANCE (Remittance B/F shipment)

REMARKS

MERCHANDISE BREAKDOWN
PK CODE

Item Name

SOS CODE

COLOR

WEB0030030082

NY WEBBING 10mm THICK 1.0mm SOFT HAND FEEL SY-01

UNIT

BLACK
WEB0030120236

PRICE( USD )

Q'ty

AMOUNT

YD

0.08200 USD

150.00

12.30

YD

0.23710 USD

1,100.00

260.81

1,250.00

273.11

NY WEBBING 25mm THICK 1.2mm SOFT HAND FEEL SY-01

BLACK

TOTAL:

※This sheet can change a dlivery, a shipment, quantity, price, etc,.

INSTRUCTION:

1. Pungkook will send message regarding any loss or missing quantity, bad quality within 30days after receiving goods.
2. After the delivery day, in the event of delay in shipment, pungkook may cancel this order or ask an air shipment or claim damages.
3. Supplier will replace any materials that do not meet standard at no cost to Pungkook. Pungkook may cancel this order and ask an air shipment and claim damages.
(Claim damages are included 100% inspection cost of Pungkook)
4. Broken packages are subject to ship back and claim damages to charge, please pack securely.
5. P/O No. should be written on each package. If supplier is missing P/O No or some of information on shipping mark,
Supplier have to pay a penalty USD $5 each packages.
6. Lead times from time of PO Placement to ship will be on follow as lead time.
Fabric, Zipper, Plastic & other of lead time is 14days.
Handle system & AL frame of lead time is 21days.
IF supplier need more above lead time for production, supplier should be inform to
Pungkook and get a new confirmation of the shipping schedule.
7. Please return the confirmed delivery date within 6days from order date.
8. After final inspection finish from supplier, supplier have to update on PK-MRP board the inspection of result.
9. All of our POs should contain one sentence that “Suppliers guarantee that their goods meet VF’s RSL standard”.

STAFF

OFF MGR

SEN MGN

DIRECTOR

Signed by vendor

Thiên Thanh

Page 1 of 1

Print Date : 11/18/2015 12:17:06






Download 15-TMI-5301 SHEN YIH



15-TMI-5301 SHEN YIH.pdf (PDF, 133.13 KB)


Download PDF







Share this file on social networks



     





Link to this page



Permanent link

Use the permanent link to the download page to share your document on Facebook, Twitter, LinkedIn, or directly with a contact by e-Mail, Messenger, Whatsapp, Line..




Short link

Use the short link to share your document on Twitter or by text message (SMS)




HTML Code

Copy the following HTML code to share your document on a Website or Blog




QR Code to this page


QR Code link to PDF file 15-TMI-5301 SHEN YIH.pdf






This file has been shared publicly by a user of PDF Archive.
Document ID: 0000316058.
Report illicit content